52

NEW ORDER 2.0 INTRODUCES AN EXTENDED INFRASTRUC-

TURE PROGRAMME DESIGNED TO SEAMLESSLY INTE-

GRATE WITH THE SHELVING SYSTEM’S GRID. EQUIPPED

WITH FULLY CONCEALED CONNECTORS, THE PANELS,

DRAWERS AND DOORS SNAP INTO PLACE, PROVIDING THE

FLEXIBILITY NEEDED TO ADAPT TO THE EVER-CHANGING

OFFICE ENVIRONMENT.

INFRASTRUCTURE