Use
Primary treatment of residential black water.
The septic tank is installed downstream of the grease traps
and/or drains of sewage (W.C.) to purify the drains through an
anaerobic digestion process. The septic tanks can be installed in
series (individual, dual chamber and three chambers).
Operation
ST septic tanks are particularly indicated to purify drains in
residential settlements of small size. Inside of septic tanks,
the process of separation of oils and greases comes through
flotation, while the separation of solids occurs through
sedimentation. Furthermore, a process of anaerobic digestion
(without the presence of oxygen) takes place. The output will
result in wastewater with solubilized and dispersed solids. Battery
installation increases the treatment efficacy and significantly
reduces the amount of suspended solids.
Maintenance
For the correct management of the ST and to achieve the required
purification results, please follow these guidelines:
•
Regularly inspect the ST to verify that no coarse materials
have accidentally blocked the pipes;
•
Remove the excess sludge on a regular basis (as per local
regulations). Such removal must be carried out by a
specialized company;
•
As provided for by the Consolidated Act on Water (Legislative
Decree 152/06 as amended), and suggested by the
normal hygiene practice, periodically inspect and wash the
inspection well.
Specification Item
Septic tank manufactured in rotational polyethylene, in a single
structure, free of joints and reinforcement plating, equipped with
inlet and outlet holes and inspection and sampling lids. Suitable for
underground installation. Septic tank constructed in accordance
with the descriptions and purification capacity indicated by the
Committee of Ministers for the Protection of waters against
pollution (Ordinary Supplement to Official Journal no. 48 of
21/02/77 paragraph 4).
PROJECT PARAMETERS
Water supply per P.E.
lt/d
150/200
Average flow (Q24) per P.E.
lt/h
8,3
Peak flow (Qp) per P.E.
lt/h
20
Specific organic load
gr BOD
5
/P.E.x d
60
Concentration of the biodegradable fraction
mg/l
300
COD/BOD
5
1,67-2,2
Total daily nitrogen load per P.E.
kg/P.E.x d
<0,012
Total surfactant concentration
mg/l
<15
Concentration of oils and fats
mg/l
<10
Retention time during the treatment stage
h
12 c.a.
Figure 1
Installation in series of model ST for domestic use, drainage into public sewers
23
C
i
v
i
l
w
a
s
t
e
w
a
t
e
r
t
r
e
a
t
m
e
n
t