ES 5941Z

Commissioning

3

Commissioning

Measures prior to commissioning

n

n

n

n

1.

Check that the plant main switch (if installed) is switched on.

Check that the controller is switched on and energised.

Check that all segments on the display are shown briefly

(

Ä Chapter 4.2 ‘Display’ on page 14).

Check that the software number and version are displayed (e.g.

519803 / SW 1.01).

In order to switch from ENGLISH to DEUTSCH for example, press

the buttons.

ð DEUTSCH flashes.

10

03/2024 Item no. 215790 EA no. 1321

The commissioning menu is displayed during initial

start-up and after a factory reset BAS12 RESET. This

is used to set the basic parameters.