Transport
Pipes, preformed parts and accessories are usually delivered by truck 'free site' (as per our valid Conditions of Sale or
Delivery). Due to the transfer of risk on delivery, it is advisable for the client to nominate and provide a person responsible
for receiving the goods. To avoid costly waiting times, the unloading locations should be suitably prepared.
Unloading, handling
Unloading is the responsibility of the client/recipient.
Except for pipes up to about DN 80, which can be unloaded manually, lifting gear must be used for unloading. To prevent
damage, especially to the thermal insulation, the preformed parts and pipes must not be thrown or rolled.
Figure 1: Suspension gear for accident-proof protective handling
Traverse with textile belts, min. 100 mm wide
Figure 2: Temporary storage on a levelled sand bed
Levelled sand bed
Figure 3: Temporary storage on wooden planks
Level surface
Stay cables at adequate distance from casing pipe.
Only attach hooks to the steel pipe
The pipes and preformed parts have been treated to protect them against moisture in the factory and where possible,
they must be stored in a dry, covered location on planks or wooden pallets in order to protect them.
17.1.2025 BGP
Subject to technical changes
Up to DN 150 min. 0.20
≥ DN 150 min. 0.25 m
max. 1.90 m
0.4 m
m
a
x
.
2
.
0
m
m
i
n
.
0
.
0
6
m
a
p
p
r
o
x
.
0
.
1
5
m
m
a
x
.
2
.
0
m