Firstly, check the integrity of the tank and the seal on the joints; send noti
fication of any defects found.
During the unloading and movement phases, pay attention not to bump the tank with hard or sharp parts.
Movement must only be carried out with the tank completely empty; it is strictly forbidden to lift the tank using the inlet or
outlet pipes.
Position the tank on a perfectly flat and levelled structure without any roughness, and resistant to the weight of the full tank.
Before installation, ensure no heat source is placed near the tank.
It is forbidden to build parts in masonry work that prejudices any maintenance or replacement of the tank itself.
Ensure an adequate drainage system to avoid flooding in the event of a rupture or leaking from the tank.
When necessary, loosen the locking pads from the coupling concerned (tanks without holes).
Ensure you blind the overflow hole (taking care not to block its regular functioning) to avoid light passage that would enable
the formation of algae and microorganisms.
Regularly clean inside the tank, as planned by current legislation in force.
Plasto tanks are created with special resins that guarantee resistance to U.V. rays; therefore, if installed as state-of-the-art,
even if exposed to sun rays, the Plasto tanks are not subject to algae formation.
If the tanks are underground (*) as
first water tanks, ensure the overflow pipe can freely flow, is linear and is as short as
possible.
Elbi reserves the right to supply water seals only. If different liquids are being used, the customer should personally install
suitable seals for the type of liquid contained in the tank.
(*) Tanks for underground only.
85
T
e
c
h
n
i
c
a
l
i
n
f
o
r
m
a
t
i
o
n