SYSTEM COMPOSITION
GREASE TRAP
GREASE TRAP
GREASE TRAP
GREASE TRAP
FINAL
–
IMHOFF TANK
(a)
–
DUAL CHAMBER
SEPTICTANK
(a)
–
THREE CHAMBER
SEPTICTANK
(a)
DEGRASSAT
DEGRASSATO
ORE
RE
VASCA
FILTRO
COMPOSIZIONE IMPIANTO
COMPOSIZIONE IMPIANTO
(a)
IMHOFF
(a)
PERCOLATORE
FILTRO
IMHOFF
VASCA
ANAEROBICO
PERCOLATORE
ANAEROBICO
PUBLIC SEWER
Table 3
SCARICO FINALE
SCARICO FINALE
CORSO D’ACQUA
(f)
Tabella 3
(f)
CORSO D’ACQUA
Tabella 3
T
FILTRO
P
AEROBICO
(b)
A
M
FANGHI ATTIVI A
DEPURAZIONE
FITO-
–
TANK
(a)
DEGRASSA
DEGRASSATO
O
–
R
RE
E
VASCA
(a)
PERCOILMATHIONFGF FILTER
VASCA
IMHOFF
(a)
–
PE
ERCOLATORE
FILTRO
(b)
SETTI
SECOND
SETTIC
SECONDA
AEROBICO
RCOLATORE
FLUSH TANK
CA
ARI
A
RIA
A
(c)
SUB-IRRIGATION (e)
(c)
Table 3
GREASE TRAP
T
DEGRASSATORE
IMHOFF
(a)
IMHOFF
VASCA
–
IMHOFF
TANK
(a)
DEGRASSA
TANK
(a))
DEGRASSAT
–O RE
FILVTAESRC
(
A
b)
IMHOFF
(a)
VASCA
SLUDGE
RE TREATMVEANSTCAPLANT
(a)
IMHOFF
(a)
ELBI S.p.A. – Amministrazione e sta
–
F
I
B
BA
GREASE TRAP
GREASE TRAP
GREASE TRAP
GREASE TRAP
GREASE TRAP
GREASE TRAP
GREASE TRAP
GREASE TRAP
GREASE TRAP
GREASE TRAP
DEGRASSATORE
DEGRASSATORE
G
IMPIANTO A FANGHI ATTIVI AD
S
bili
IMPIANTO A
SECONDARY
NGHI ASTETPIVTIIAC TANK
(c)
PIANTO A
ASSO CARICO
SSO CARICO
FITO-
(d)
–
TANK
(a)
DEGRASSAT
–
O
IMHOFF
(a)
D EP
H
T
URAZIONE
(d)
I ATTIVI AD
OTALE
–
TANK
(a)
DEGRASSAT
–
O RE
IMPIANTO A FAN
OSSIDAZIONE
PHYTODEPURATION
(d)
O TALE
–
OSSIDAZIONE T
TREATMENT PLANT
TRATTAMENTO
ECONDARIO SPINTO
SCARICO SU SUOLO
(f)
Tabella 4
(f)
SCARICO SU SUOLO
(f)
–
IMHOFF TANK
(a)
DEGRASSAT
DEGRASSATO
O
–
R
RE
E
VASCA
SECONDARY
IMHOFF
(a)
(g)
TREVAATSMCEANT
(a)
IMHOFF
SECONDARIO
TRATTAMENTO
SECONDARIO
(g)
TRATTAMENTO
(g)
DRAIN ON THE GROUND
Tabella 4
Table 4
IRRIGAZIONE
DEGRASSATORE
VASCA
TRATTAMENTO
IMHOFF
(a)
SECONDARIO SPINTO
IRRIGATION
(h)
(h)
–
–
O
DRIVEN SECONDARY
VASCA
RE
TREATMENT
Tabella 4
(h)
IRRIGAZIONE
Table 4
Tabella 4
–
TANK
(a)
–
FILTER
mento: Via Buccia, 9 – 35010 LIMENA (P D)–
WATER COURSE
(f)
Table 3
–
TANK
(a)
Tel.04988
Tel. 049 884
40
–
067
677–FaxCommerciale
(
0
b
4
)
98841610–F
FILTER
ELBI S.p.A. – Amministrazione e stabil
Stabilimento e deposito: Via delle
7 – Fax Commerciale 049 8841610 – Fax
ax
–
im
Ma
A
Amministrativo 049 76
(
9
c)
675 – Internet:
TANK
ento: Via Buccia, 9 – 35010 LIMENA (PD)
gnolie – 70026 MODUGNO (BA) – Tel. 0
mministrativo 049 769675 – Internet:
ht
htt
–P
805
tp:
Partita I.V.A. 00838770287
p://www.elbi.it – E-mail: info@elbi.it
artita I.V.A. 00838770287
316843 – Fax 080 5316822
//www.elbi.it – E-mail: info@elbi.it
Stabilimento e deposito: Via delle Magnolie – 70026 MODUGNO (BA) – Tel. 080
2/3
531 6843 – Fax 080 5316822
–
TANK
(a)
–
SLUDGE
TREATMENT PLANT
2/3
–
TANK
(a)
–
PHYTODEPURATION
(d)
–
TREATMENT PLANT
Notes:
a) Legislative Decree 152/2006 provides for the use of Imhoff biological type tanks for the primary treatment of black water. The installation of septic tanks is only allowed in case of
replacement within existing plants. In any case, you should consult the local governments that, in certain cases, provide even the installation of septic tanks, dual-chamber with three
chamber septic tanks.
b) The outlet of the aerobic percolating filter is fitted on the bottom of the tank. In the case of no slope to allow washing off the filter, it is recommended to uplift the sewage liquid to force
its drainage.
c) The outlet of the aerobic percolating filters is fitted on the bottom of the tanks. Solid particles
flow away spontaneously. It is recommended to install the aerobic percolating filters and
additional septic tank after to avoid that solid particles contaminate the environment. In the case of drainage directly on the soil, the secondary septic tank must also be installed after
anaerobic filters.
d) When phytodepuration is carried out after degreaser and Imhoff tanks, an absorption area of 3 m2/P.E. is required. In the case of phytodepuration as re
fining tertiary system an
absorption area of 1 m2/P.E. is required.
e) In the case of sub-irrigation drain, ELBI advice for installation of a secondary treatment (with percolating filter or activated sludge system) to avoid bad odours and potential stoppage
of seepage of the irrigation pipes.
f) According to Legislative Decree 152/2006, a stream must guarantee at least 120 days p/year of water flow. If this flow is not ensured, the final outlet has to be considered as wastewater
on the soil.
g) For secondary treatment systems, please contact the technical office of ELBI S.p.A.
h) For a system with final destination as irrigation, please contact the technical office of ELBI S.p.A.
NOTE: Before installation, always contact the local responsible for obtaining the necessary permits for the dumping of the waste.
90