PLANT SOLUTIONS IN RELATION TO THE FINAL WASTEWATER

DRAINAGE

SYSTEM COMPOSITION

GREASE TRAP

GREASE TRAP

GREASE TRAP

GREASE TRAP

FINAL

IMHOFF TANK

(a)

DUAL CHAMBER

SEPTICTANK

(a)

THREE CHAMBER

SEPTICTANK

(a)

DEGRASSAT

DEGRASSATO

ORE

RE

VASCA

FILTRO

COMPOSIZIONE IMPIANTO

COMPOSIZIONE IMPIANTO

(a)

IMHOFF

(a)

PERCOLATORE

FILTRO

IMHOFF

VASCA

ANAEROBICO

PERCOLATORE

ANAEROBICO

PUBLIC SEWER

Table 3

SCARICO FINALE

SCARICO FINALE

CORSO D’ACQUA

(f)

Tabella 3

(f)

CORSO D’ACQUA

Tabella 3

T

FILTRO

P

AEROBICO

(b)

A

M

FANGHI ATTIVI A

DEPURAZIONE

FITO-

TANK

(a)

DEGRASSA

DEGRASSATO

O

R

RE

E

VASCA

(a)

PERCOILMATHIONFGF FILTER

VASCA

IMHOFF

(a)

PE

ERCOLATORE

FILTRO

(b)

SETTI

SECOND

SETTIC

SECONDA

AEROBICO

RCOLATORE

FLUSH TANK

CA

ARI

A

RIA

A

(c)

SUB-IRRIGATION (e)

(c)

Table 3

GREASE TRAP

T

DEGRASSATORE

IMHOFF

(a)

IMHOFF

VASCA

IMHOFF

TANK

(a)

DEGRASSA

TANK

(a))

DEGRASSAT

–O RE

FILVTAESRC

(

A

b)

IMHOFF

(a)

VASCA

SLUDGE

RE TREATMVEANSTCAPLANT

(a)

IMHOFF

(a)

ELBI S.p.A. – Amministrazione e sta

F

I

B

BA

GREASE TRAP

GREASE TRAP

GREASE TRAP

GREASE TRAP

GREASE TRAP

GREASE TRAP

GREASE TRAP

GREASE TRAP

GREASE TRAP

GREASE TRAP

DEGRASSATORE

DEGRASSATORE

G

IMPIANTO A FANGHI ATTIVI AD

S

bili

IMPIANTO A

SECONDARY

NGHI ASTETPIVTIIAC TANK

(c)

PIANTO A

ASSO CARICO

SSO CARICO

FITO-

(d)

TANK

(a)

DEGRASSAT

O

IMHOFF

(a)

D EP

H

T

URAZIONE

(d)

I ATTIVI AD

OTALE

TANK

(a)

DEGRASSAT

O RE

IMPIANTO A FAN

OSSIDAZIONE

PHYTODEPURATION

(d)

O TALE

OSSIDAZIONE T

TREATMENT PLANT

TRATTAMENTO

ECONDARIO SPINTO

SCARICO SU SUOLO

(f)

Tabella 4

(f)

SCARICO SU SUOLO

(f)

IMHOFF TANK

(a)

DEGRASSAT

DEGRASSATO

O

R

RE

E

VASCA

SECONDARY

IMHOFF

(a)

(g)

TREVAATSMCEANT

(a)

IMHOFF

SECONDARIO

TRATTAMENTO

SECONDARIO

(g)

TRATTAMENTO

(g)

DRAIN ON THE GROUND

Tabella 4

Table 4

IRRIGAZIONE

DEGRASSATORE

VASCA

TRATTAMENTO

IMHOFF

(a)

SECONDARIO SPINTO

IRRIGATION

(h)

(h)

O

DRIVEN SECONDARY

VASCA

RE

TREATMENT

Tabella 4

(h)

IRRIGAZIONE

Table 4

Tabella 4

TANK

(a)

FILTER

mento: Via Buccia, 9 – 35010 LIMENA (P D)–

WATER COURSE

(f)

Table 3

TANK

(a)

Tel.04988

Tel. 049 884

40

067

677–FaxCommerciale

(

0

b

4

)

98841610–F

FILTER

ELBI S.p.A. – Amministrazione e stabil

Stabilimento e deposito: Via delle

7 – Fax Commerciale 049 8841610 – Fax

ax

im

Ma

A

Amministrativo 049 76

(

9

c)

675 – Internet:

TANK

ento: Via Buccia, 9 – 35010 LIMENA (PD)

gnolie – 70026 MODUGNO (BA) – Tel. 0

mministrativo 049 769675 – Internet:

ht

htt

–P

805

tp:

Partita I.V.A. 00838770287

p://www.elbi.it – E-mail: info@elbi.it

artita I.V.A. 00838770287

316843 – Fax 080 5316822

//www.elbi.it – E-mail: info@elbi.it

Stabilimento e deposito: Via delle Magnolie – 70026 MODUGNO (BA) – Tel. 080

2/3

531 6843 – Fax 080 5316822

TANK

(a)

SLUDGE

TREATMENT PLANT

2/3

TANK

(a)

PHYTODEPURATION

(d)

TREATMENT PLANT

Notes:

a) Legislative Decree 152/2006 provides for the use of Imhoff biological type tanks for the primary treatment of black water. The installation of septic tanks is only allowed in case of

replacement within existing plants. In any case, you should consult the local governments that, in certain cases, provide even the installation of septic tanks, dual-chamber with three

chamber septic tanks.

b) The outlet of the aerobic percolating filter is fitted on the bottom of the tank. In the case of no slope to allow washing off the filter, it is recommended to uplift the sewage liquid to force

its drainage.

c) The outlet of the aerobic percolating filters is fitted on the bottom of the tanks. Solid particles

flow away spontaneously. It is recommended to install the aerobic percolating filters and

additional septic tank after to avoid that solid particles contaminate the environment. In the case of drainage directly on the soil, the secondary septic tank must also be installed after

anaerobic filters.

d) When phytodepuration is carried out after degreaser and Imhoff tanks, an absorption area of 3 m2/P.E. is required. In the case of phytodepuration as re

fining tertiary system an

absorption area of 1 m2/P.E. is required.

e) In the case of sub-irrigation drain, ELBI advice for installation of a secondary treatment (with percolating filter or activated sludge system) to avoid bad odours and potential stoppage

of seepage of the irrigation pipes.

f) According to Legislative Decree 152/2006, a stream must guarantee at least 120 days p/year of water flow. If this flow is not ensured, the final outlet has to be considered as wastewater

on the soil.

g) For secondary treatment systems, please contact the technical office of ELBI S.p.A.

h) For a system with final destination as irrigation, please contact the technical office of ELBI S.p.A.

NOTE: Before installation, always contact the local responsible for obtaining the necessary permits for the dumping of the waste.

90