Fig. 19: First fix rail
If the section of the building is not yet ready for the installation of the
heat interface unit, a first fix rail can be installed in advance. All the
pipes are routed to this rail from below and can be filled and vented
up to the shut-off valves.
The unit is subsequently mounted on the fix rail(
Ä Chapter 5
‘Assembly’ on page 34).
By using the flushing bypass (Fig. 20), the primary circuit can be
flushed without water flowing through the heat interface unit.
The pipe connection set makes it easier to connect lines that are
guided into the unit from above. The unit is subsequently mounted on
the connecting rail (
Ä Chapter 1.2 ‘Other applicable documents’
on page 8).
When the unit is installed in a living area, the white front cover can
help integrate the unit better into the flat.
Fig. 20: Flushing bypass
V03 06/2025 Item no. 215250 EA no. 1292
Operating instructions
29
NOTICE!
The valves of the flushing bypass must be closed
when the unit is in normal operation.