Now determine the required chamber height.
D is the distance between the ground surface
and the base of the inlet pipe.
Height
of systems chamber
(Installation depth D)
Height engineering
systems base
from base of inlet to top
Note: check on-site max groundwater levels
The KESSEL system chambers are resistant to
groundwater depths up to 3.000 mm. Now
subtract 522 mm from the inlet depth and you
have the height of the required engineering
chamber. Now you can select a module with
the corresponding height and the required cover
from the article list. Please note the maximum
permissible total installation depth is 5.000 mm.
During planning, please also note the following:
• The maximum cable length is 30 m.
• Stipulate that the ventilation pipe and the cable
conduit must be laid with a continuous slope toward
the Ecolift XL (helps drain collected water in the pipe).
Cable conduit
Ventilation pipe
Optional cable conduit sealing kit: page 89
D
e
p
t
h
o
f
w
a
s
t
e
w
a
t
e
r
p
i
p
e
a
c
c
o
r
d
i
n
g
p
l
a
n
5
2
2
D
1
–
D
1
1
H
y
b
r
i
d
l
i
f
t
i
n
g
s
t
a
t
i
o
n
s